Table of Contents
Articles
STUDI PERBANDINGAN BIAYA KONSTRUKSI PERKERASAN KAKU DAN PERKERASAN LENTUR | |
Rudi Waluyo, Waluyo Nuswantoro, Lendra Lendra | pp. 1-10 |
STUDI BEBERAPA KRITERIA HYDRAULIC CRITICAL INDEX (LINK IMPORTANCE) PADA JARINGAN PIPA | |
Radianta Triatmadja | pp. 11-20 |
FINITE ELEMENT MODELING OF 100% OVERLAPPED CHS UNIPLANAR K-JOINTS (INVESTIGATION OF THE FAILURE MODES) | |
Leary Pakiding | pp. 21-30 |
PENGUKURAN PRODUKTIVITAS KELOMPOK PEKERJA BANGUNAN DALAM PROYEK KONSTRUKSI (STUDI KASUS PROYEK GEDUNG BERTINGKAT DI SURAKARTA) | |
Wulfram I. Ervianto | pp. 31-42 |
KAJIAN PROSEDUR PENGADAAN JASA KONSTRUKSI SECARA E- PROCUREMENT | |
S S Purwanto S S Purwanto | pp. 43-56 |
PENGENDALIAN DAMPAK PERUBAHAN DESAIN TERHADAP WAKTU DAN BIAYA PEKERJAAN KONSTRUKSI | |
Ari Sandyavitri | pp. 57-70 |
BIAYA KEMACETAN RUAS JALAN KOTA YOGYAKARTA | |
Imam Basuki, Siswadi Siswadi | pp. 71-80 |